国产午夜精品无码理论片,亚洲一区二区三级av,cl1024久久av,亚洲精品中文字幕不卡

歡迎進(jìn)入山東永藍(lán)環(huán)保設(shè)備工程有限公司!主營:洗滌塔,尾氣凈化塔,酸霧洗滌塔等廢氣洗滌塔生產(chǎn)安裝服務(wù)。

咨詢熱線:
0530-8586555

聯(lián)系我們

CONTACT

131 0530 3235
山東永藍(lán)環(huán)保設(shè)備工程有限公司
電話:13105303235
座機(jī):0530-8586555
廠址:山東省菏澤市巨野縣中小企業(yè)孵化園

酸霧洗滌塔安裝及維護(hù)保養(yǎng),你都知道嗎?

來源:未知 ?? 作者: admin; 發(fā)布日期:2019-12-16 16:19

酸霧洗滌塔安裝及維護(hù)保養(yǎng),你都知道嗎?
Do you know the installation and maintenance of acid mist scrubber?
1、用戶應(yīng)根據(jù)我公司供給的根底材料圖,進(jìn)行混凝土根底施工。根底的裝置面,應(yīng)包管在同一水平面上,酸霧洗滌塔底腳須知螺栓或沓接固定在根底的鋼板上。
1. The user shall carry out concrete foundation construction according to the foundation material drawing provided by our company. The device surface of the root bottom shall be guaranteed to be on the same horizontal surface, and the bottom foot of the acid mist washing tower shall be fixed on the steel plate at the root bottom with bolts or taps.
酸霧洗滌塔
2、風(fēng)機(jī)裝置時,應(yīng)謹(jǐn)防雜物掉入風(fēng)機(jī)內(nèi)。酸霧洗滌塔裝置完成后,在試車之前有必要鏟除塔內(nèi)污物。
2. When the fan is installed, the sundries shall be prevented from falling into the fan. After the completion of acid mist scrubber, it is necessary to remove the dirt in the tower before commissioning.
3、因通常玻璃鋼制品易燃,裝置及修理過程中,禁止運(yùn)用明火。
3. Since FRP products are usually inflammable, it is forbidden to use open fire in the process of device and repair.
4、如風(fēng)機(jī)裝置在室內(nèi),風(fēng)機(jī)的電機(jī)有必要采納防雨辦法。
4. If the fan is installed indoors, it is necessary to adopt rainproof measures for the motor of the fan.
5、 酸霧洗滌塔有必要有專人職責(zé)辦理,常常查看風(fēng)機(jī)工作能否正常,液位能否政黨液位箱中浮球開關(guān)能否正常,溶液濃度能否在規(guī)則規(guī)模等等,如發(fā)現(xiàn)問題,應(yīng)及時處置。
5. It is necessary to assign a special person to handle the acid mist scrubber, often check whether the fan can work normally, whether the liquid level can be normal or not, whether the float switch in the liquid level tank can be normal, whether the solution concentration can be in the regular scale, etc. if any problem is found, it should be dealt with in time.
6、為保證貯液箱中液位,避免開關(guān)風(fēng)機(jī)時導(dǎo)致液位升降,有必要在敞開風(fēng)機(jī)后,敞開浮球供水閥,封閉風(fēng)機(jī)前,先封閉浮球供水閥。液位高度靜態(tài)應(yīng)控制在離地650mm左右為宜。
6. In order to ensure the liquid level in the liquid storage tank and avoid the rise and fall of the liquid level when the fan is switched on and off, it is necessary to open the floating ball water supply valve after the fan is turned on, and close the floating ball water supply valve before the fan is closed. The height of liquid level should be controlled about 650mm above the ground statically.
7、酸霧洗滌塔金屬支架至少每年進(jìn)行防腐處置二次
7. The metal support of acid mist scrubber shall be subject to anti-corrosion treatment at least twice a year
酸霧凈化塔操作規(guī)程 | 酸霧凈化塔的工作原理
Code of operation for acid mist purification tower working principle of acid mist purification tower
1、 酸霧洗滌塔宜安裝在高出地面100mm以上的混凝土基礎(chǔ)上,水泵、風(fēng)機(jī)應(yīng)按要求另作混凝土基礎(chǔ)。
1. The acid mist scrubber should be installed on the concrete foundation 100mm above the ground, and the water pump and fan should be used as the concrete foundation separately as required.
2、運(yùn)輸安裝時要注意保護(hù),不得碰損機(jī)體及部件。
2. Pay attention to protection during transportation and installation, and do not damage the body and components.
3、吸收塔出廠時,本廠根據(jù)具體情況,采用分段包裝運(yùn)輸,由本廠派員到現(xiàn)場安裝調(diào)試。
3. When the absorption tower is delivered from the factory, the factory will transport it in sections according to the specific conditions, and send personnel to the site for installation and commissioning.
4、吸收塔安裝和工作在室外的,冬季應(yīng)對底部水池部位注意防凍。
4. If the absorption tower is installed and operated outdoors, pay attention to antifreeze at the bottom pool in winter.
酸霧凈化塔具有哪些顯著的***點(diǎn)
What are the remarkable characteristics of acid mist purification tower
5、吸收塔底部水池有液位標(biāo)記,使用前務(wù)必按液位標(biāo)記注入吸收液。使用過程中應(yīng)注意補(bǔ)充吸收液。
5. The water tank at the bottom of the absorption tower is provided with a liquid level mark, and the absorption liquid must be filled according to the liquid level mark before use. Pay attention to supplement the absorption liquid during use.
6、使用時應(yīng)先開循環(huán)水泵2~3分鐘,再開鼓風(fēng)機(jī),停機(jī)時,應(yīng)先停鼓風(fēng)機(jī)1~2分鐘后,再停循環(huán)水泵。
6. The circulating water pump shall be turned on for 2-3 minutes before the blower is turned on. When the blower is turned off, the blower shall be turned off for 1-2 minutes before the circulating water pump is turned off.
7、應(yīng)根據(jù)使用情況定期檢查塔底部水池內(nèi)液體酸性濃度及排出氣口氣體凈化程度,超出標(biāo)準(zhǔn)時,應(yīng)更換底部水池中的吸收液。
7. The acid concentration of the liquid in the tank at the bottom of the tower and the purification degree of the gas at the outlet shall be checked regularly according to the service conditions. If it exceeds the standard, the absorption liquid in the tank at the bottom shall be replaced.
8、吸收塔一年半至二年應(yīng)做一次檢修,檢查盤狀噴淋管和填料的填塞情況,并對其進(jìn)行清洗。
8. The absorption tower shall be overhauled once a year and a half to two years, and the filling condition of disc spray pipe and packing shall be checked and cleaned.

天天摸天天添人人澡| 毛片日产av一区二区三区四区| 国产色哟哟精选在线播放| 老狼精品卡1卡2卡3网| 让女人下面出水视频| 日本人妻与家公的伦理片| 精品一区二区av天堂色偷偷| 操女人大逼视频下载| 国产 日韩 亚洲 一区| 精品久久久久久久人妻换| 成人av大全免费一区二区三区| 国产黄片在线免费看| 九九视频这里只有精品| 亚洲激情无码视频| 国产午夜久久精品一区四虎| 干女人逼逼的大几把| 翘臀小穴在线观看| 亚洲欧美一区二区爽爽爽| 国产成人AV一区二区在线观看| 91在线一区二区| 日本二区在线观看| 伊人久久丁香色婷婷啪啪| 大胸美女被c的嗷嗷叫视频| 日本成人精品一区二区三区| 西西大尺度无码免费视频| 欧美一区二区三区刘玥| 公交车上被后入搞逼漫画| 日本免费无码一区二区到五区| 日本十八禁大骚逼| 性爱大鸡吧喷水视频| 国产伦精品一区二区三区福利| 国产精品粉嫩懂色av| 内射白嫩少妇超碰| 亚洲av无一区二区三区综合| 久久69精品久久久久免| 无遮挡粉嫩久久久久久久| 一区二区三区av精品| 久久一区二区三区精华液介绍| 久久久久人妻一区精品加勒比| 被公侵犯人妻少妇一区二区三区| 国产一区二区三区在线观|